By: Joachim Amland On: 12. September 2016 In: Ukategorisert Comments: 0

With assistance from FEMKUBER Tidetec have now completed a structural integrity analysis. We found the structure to be sound, however with some improvements to the anchors for the concrete delta blocks. We will have an additional cargo straps as safety, to make sure that the deltablocks will be firmly attached to the structure after 4-12 weeks in harsh salt water conditions.

Thanks to Adam Olsson and Arne Ziegler for a good job!