By: Joachim Amland On: 12. September 2016 In: Ukategorisert Comments: 0

We have now conducted the final sea bed inspection at the prototype installation site. The conditions are looking optimal with good visibility, hardpacked, and smooth sand surface with an ideal depth of 5 meters.

Thanks to Erling Elind for excellent diving!

 

We are now one step closer to installation next week.

fil-12-09-2016-08-49-02